Managing Risk on Large-Scale Construction Projects
Managing risk on a large construction project comes down to one discipline: name every threat to programme, cost and safety before it happens, put a n
Spring & Co Insights
Practical perspective on project management, cost, compliance and property from the Spring & Co team in Stockport. A reference library for developers, contractors and funders.
Project Management
Managing risk on a large construction project comes down to one discipline: name every threat to programme, cost and safety before it happens, put a n
Cost
Carry 5% to 10% of the construction cost on a new build with a settled design, and 10% to 15% on a refurbishment or a conversion. Below 5% you are not
Planning
Yes, the Construction (Design and Management) Regulations 2015 apply to your refurbishment exactly as they apply to a new build. Strip out a shopfloor
Hiring
Choose a construction consultancy on three things, in this order: whether the person actually walking your site is chartered, whether the firm carrie
monitoring
Development finance is not handed over in one lump on completion day. It is released in stages called drawdowns, paid in arrears against an independen
Contracting
Good project supervision keeps quality and programme on track by inspecting the right work at the right moment and holding the programme to dated evid
Property
A property development runs through eight stages, from the first feasibility appraisal to practical completion and handover. On a mid-sized commercial
Sustainability
The rule that matters most for existing buildings in 2026 is blunt: if the energy rating is too low, you may not be allowed to let it. Commercial prem
CDM Safety
The health and safety file is the record you hand the client at handover so anyone who works on the building in future can do it safely. Under Regulat
Cost
Early cost advice changes a project because the decisions that fix most of the budget are taken in the first few weeks, before a spade touches the gr
Property
Repurposing a commercial building means changing what it is used for, most often an old office or a tired shop becoming flats. In England you can ofte
Quality Assurance
A quality assurance regime on a construction site is the system that proves the work is right before it gets covered up. In practice that means an ins
Planning
Planning permission decides whether you are allowed to build something. Building regulations decide whether the thing you build is safe and legal to u
CDM Safety
Most serious site safety failures trace back to a decision made months before anyone broke ground, by someone who never had to build the thing. A haza
Contracting
Construction management is a procurement route where you, the developer, hold the trade contracts directly and pay a construction manager a fee to ru
Cost
Preliminaries are the cost of running the site rather than building the works. Site setup, welfare, scaffolding, site management, temporary services,
monitoring
An independent project audit works because the person checking the build has no stake in the answer. Your contractor wants the next payment released.
Property
Tenant management protects a commercial property investment in three practical ways: it keeps the building legally lettable, keeps a paying tenant in
Project Management
A construction manager coordinates trades on a live site by controlling one thing above everything else: sequence. Who works where, in what order, and
Cost
The final account is where a build gets quietly signed off or turns into a fight, and which one you get is decided months earlier. Agree the cost of e
Cost
Value engineering is supposed to take money out of a construction project while your scope and quality stay exactly where they were. Run properly, and
Monitoring
A lender opens a project monitoring report looking for one figure above all others: the cost to complete, and whether the money still sitting in the f
Sustainability
The short version for 2026: you are still building new homes to the Part L 2021 uplift, roughly 31% less carbon than the 2013 standard, while the Futu
cost
A construction project goes over budget for reasons that are settled long before anyone breaks ground. The three that matter most are the cost plan, t