Asbestos Surveys Before Refurbishment: Why They Come First

Asbestos Surveys Before Refurbishment: Why They Come First

If a building was built before 2000, it may contain asbestos, and before any refurbishment or demolition work that disturbs its fabric, a refurbishment and demolition survey of the affected areas is needed. The management survey most building owners already hold is not designed for this and is not enough on its own. Getting the right survey early protects the people doing the work and stops asbestos finds from derailing the programme.

Asbestos remains one of the most serious health risks in construction, because the diseases it causes develop many years after exposure. The Control of Asbestos Regulations 2012 set out how it must be managed, and refurbishment is where most accidental disturbance happens.

What is the difference between the two surveys?

Management surveyRefurbishment and demolition survey
PurposeTo manage asbestos in a building in normal useTo find asbestos before work disturbs the fabric
How intrusiveLimited, mostly accessible areasFully intrusive in the areas to be worked on
WhenFor occupied buildings, kept under reviewBefore refurbishment or demolition starts
AccessBuilding stays in useAreas usually need to be vacated

A refurbishment and demolition survey is intrusive by design. Surveyors lift floors, open ceiling voids, break into boxing and walls, and look inside plant, because that is where the contractor will be working. It usually has to happen once the area is empty, which is one reason it needs planning into the programme.

Why must it come before design and pricing?

Because what it finds affects both. If asbestos is present, it may need to be removed by a licensed contractor before other work can start, which takes time and has a cost. It may also change the design: sometimes it is better to leave asbestos in place, properly managed, and design around it. None of that can be worked out if the survey arrives after the contractor has started.

Under CDM 2015, the client must provide pre-construction information to designers and contractors, and asbestos information is one of the most important parts of it. A contractor pricing a strip out without a proper survey is pricing blind, and will either add risk money or come back with a claim.

What happens if asbestos is found?

That depends on the type and condition of the material and the work planned. Some work must be carried out by a contractor licensed by HSE. Some is non-licensed but notifiable. Some lower risk work is non-licensed. The survey report identifies the materials and their condition, and your advisers and a competent removal contractor can then plan the right approach.

What should not happen is work carrying on while everyone hopes for the best. If suspect material is found unexpectedly during works, the work in that area should stop until it has been assessed.

How can clients avoid delays?

  • Check the date of your building and whether any asbestos information already exists
  • Commission the refurbishment and demolition survey at design stage, not after tender
  • Plan vacant access to the areas that need surveying
  • Allow time for any licensed removal in the programme, including any notification period
  • Pass the full report to the design team and every contractor pricing the work

What about occupied buildings?

Many refurbishments happen in buildings that stay partly in use, such as schools, hospitals and offices. That makes asbestos planning even more important, because the people nearby are not construction workers. Phasing, segregation and communication with occupants all need to be planned around the survey findings.

How we help

Our construction health and safety team and CDM advisors help clients plan asbestos surveys, interpret the findings and build them into the design, pre-construction information and programme. Spring & Co holds CHAS accreditation and NEBOSH-qualified staff, and has supported refurbishment work for public and private clients since 1992. Get in touch before your next refurbishment reaches tender.