Retention is a percentage of each interim payment that the client holds back as security, in case the contractor does not put right defects. Under JCT contracts the default rate is 3%, although parties often agree a different figure. Typically half is released at practical completion and the rest at the end of the rectification period, which is commonly twelve months.
Retention is one of the most familiar features of UK construction contracts, and one of the most argued about. Used properly it protects the client. Handled badly it causes cash flow problems down the supply chain and disputes at the end of the job.
How is retention calculated?
At each interim valuation, the value of work done and materials on site is assessed. The retention percentage is deducted from that gross value, and the client pays the balance less previous payments. So if the gross valuation is £500,000 and retention is 3%, £15,000 is held back in total at that point.
The amount retained grows as the work progresses. By practical completion, it represents a meaningful sum held against the finished building.
When is retention released?
| Event | Typical release |
|---|---|
| Practical completion | Half of the retention |
| Sectional completion | Half of the retention for that section |
| End of rectification period and making good of defects | The remaining half |
The final release usually follows the certificate of making good, which confirms that defects notified during the rectification period have been put right. The exact mechanism depends on the contract, so the specific terms always need checking.
What is retention actually for?
It gives the client a hold over the contractor and a fund if defects appear and the contractor does not return to fix them. If the contractor fails to put right a defect, the client may be able to use the retention to pay someone else to do it, following the process the contract sets out.
It is not a general discount, a source of cash flow for the client, or a way of recovering unrelated costs. Treating it as any of those is a common cause of disputes.
Where does retention cause problems?
- Late release. Retention that is not released when due puts real strain on contractors and subcontractors, who often run on tight margins.
- Unclear defects. If there is no agreed defects list, arguments about whether the final half should be released drag on.
- Insolvency. If the party holding retention becomes insolvent, the money may be lost to those it was owed to. JCT contracts include provisions about holding retention on trust, and some clients use separate accounts.
- Chains of retention. Main contractors typically hold retention from subcontractors too, so delays at the top pass down the chain.
Are there alternatives?
Yes. Some clients accept a retention bond instead of cash retention, where a surety guarantees the amount. Others reduce or remove retention on projects where the contractor's track record and other security, such as a performance bond or parent company guarantee, give enough protection. Each option has a cost, and the right answer depends on the project and the contractor.
How should a client manage it well?
Keep it simple and fair. Agree the rate and release points clearly in the contract. Record defects properly at practical completion and during the rectification period. Release each half on time when the conditions are met. And keep track of retention in the monthly cost report, so everyone can see what is being held and when it falls due.
Our cost management and quantity surveying team handles valuations, retention and final accounts for clients across the UK, and our quality assistance team keeps the defect records that make release straightforward. Talk to Spring & Co if you want a clear view of the money held on your project.