Handover Done Properly: O and M Manuals, Training and As-Built Drawings
Good handover means the people who will run the building can operate and maintain it from day one. That needs complete operation and maintenance manuals, accurate as-built drawings, commissioning and test records, warranties, the health and safety file and proper training for the facilities team. When these arrive late or incomplete, the first months of occupation are spent working things out the hard way.
Handover is often rushed because it comes at the end, when the programme is tight and everyone is focused on practical completion. Yet it decides how well the building works for years afterwards.
What should be handed over?
| Item | What it is for |
|---|---|
| Operation and maintenance manuals | How to run and maintain every system and product in the building |
| As-built drawings | What was actually built, including service routes and changes |
| Commissioning and test records | Proof that systems were set up and tested properly |
| Warranties and guarantees | Who to contact and what is covered |
| Health and safety file | Information needed to carry out future work safely |
| Certificates | Building control completion, fire, electrical, gas, energy performance |
| Training | Demonstrations for the people who will operate the systems |
Why are as-built drawings so often wrong?
Because buildings change during construction, and updating drawings is easy to leave until the end. A drainage run moved to avoid an obstruction, a riser rerouted, a door relocated: each is minor at the time. Years later, someone planning works relies on drawings that do not show what is really there. The fix is to require as-built information to be updated as work progresses and checked before handover.
What makes training effective?
It is delivered by people who know the systems, to the people who will actually run them, on site and with the systems working. A single session in the last week, attended by whoever is available, rarely sticks. Planning training into the programme, recording it and following up after occupation makes a real difference, especially for heating, ventilation and building management systems.
How can clients get handover right?
- Set out handover requirements in the contract documents, not at the end
- Ask for draft O and M manuals well before completion, and review them
- Involve the future facilities team early, ideally during design
- Make completeness of handover information part of the practical completion checks
- Plan a review a few months after occupation to pick up gaps
Some clients follow a soft landings approach, which extends the design and construction team's involvement into the first period of occupation, so problems are resolved while the knowledge is still on hand. Even without adopting it formally, the principle is sound.
Who manages it?
Usually the project manager or contract administrator, working with the contractor and the design team. It needs someone who will check the information rather than just receive it.